News

Rt. 29 Solutions Lane Closures – Scheduled Activities: Week of Nov. 16 – 20

route 29 solutions vdotCHARLOTTESVILLE — The following work is scheduled, weather permitting, on the Route 29 corridor in Albemarle County and the City of Charlottesville during the upcoming week. Speed limits may be reduced and traffic movements may be restricted within highway work zones.

(UPDATE) Route 29/250 Bypass interchange – Contractor is installing storm drain structures; installing a new traffic signal at Angus Road; building sidewalks and installing guardrail in the Route 29 median; and widening the ramp. Motorists should be alert for equipment entering and exiting the highway.

  • On Monday from 9 p.m. to 6 a.m., the southbound Route 29 outside lane will be closed from Hydraulic Road to the Route 250 Bypass. The ramp to westbound Route 250 Bypass will be closed with a detour in place for motorists. Virginia State Police will assist with traffic control.
  • Monday through Friday from 8 a.m. to 4 p.m., the ramp from the westbound Route 250 Bypass to Barracks Road will be narrowed with a left shoulder closure. The ramp from Barracks Road to the eastbound Route 250 Bypass will also be narrowed with a right shoulder closure.
  • Monday through Friday from 9 a.m. to 4 p.m., the westbound Route 250 Bypass outside lane will be closed from Hydraulic Road to Barracks road.
  • Tuesday through Friday from 9 p.m. to 6 a.m., the southbound Route 29 outside lane will be closed from Angus Road to the Route 250 Bypass. The ramp to westbound Route 250 Bypass will be closed with a detour in place for motorists.

(UPDATE) Rio Road grade-separated intersection – Utility relocation work continues in the vicinity of the Rio Road intersection. The following work is scheduled Sunday through Friday nights from 8:30 p.m. to 7 a.m.:

  • Alternating triple lane closures will be in place on northbound Route 29 from Fashion Square Drive to Albemarle Square. Motorists wishing to turn left from Route 29 to Rio Road should use Berkmar Drive as the detour route.
  • Alternating triple lane closures will be in place on southbound Route 29 from Albemarle Square to Fashion Square Drive. Motorists wishing to turn left from Route 29 to Rio Road should use Branchlands Blvd. and Hillsdale Drive as the detour route.
  • Both directions of Rio Road will be closed with a single lane open for local business traffic.

Route 29 widening – Median clearing from Polo Grounds Road to Towncenter Drive. The following work on Route 29 is scheduled Sunday through Friday from 9 p.m. to 6 a.m.:

  • Single alternating lane closures will occur on northbound and southbound Route 29 from Towncenter Drive to Rio Mills Road as necessary for barrier installation. Expect delays.

More information about these projects, and other Route 29 Solutions projects, can be found on the project website, www.Route29Solutions.org. Information about other Culpeper District activities that will affect traffic is also available on Twitter at @VaDOTCULP and on VDOT’s website at: www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.

Our Mission

The Charlottesville Regional Chamber of Commerce is dedicated to representing private enterprise, promoting business, and enhancing the quality of life in our Greater Charlottesville communities.